Air conditioning system

customer

AEC COSTRUZIONI

division

AIR CONDITIONING

Date

YEAR
2015

LOCATION MIRANDOLA (MO)

INSTALLATION DESCRIPTION

Execution of a new air conditioning system with a heat pump at refrigerator gas variable flow

TECHNICAL DETAILS
  • N. 6 outdoor motor condensing units in heat pumps at refrigerator gas variable flow. Thermal input 31 kw, cooling power 28kw
  • N. 33 indoor cassette units for the dropped ceiling installation
  • N. 4 static heat recovery air units/ air renewal system 200 mc/h capacity

OTHER ACHIEVEMENTS

We respect your Privacy.
We use cookies to ensure you an accurate experience and in line with your preferences.
With your consent, we use technical and third-party cookies that allow us to process some data, such as which pages are visited on our website.
To find out more about how we use this data, read the full disclosure.
By clicking the ‘Accept’ button, you consent to the use of cookies, or configure the different types.

Configure cookies Reject
Accept
Loading...