Cooling system Saint Gobain

customer

Verallia Saint-Gobain Vetri Spa

division

Conditioning

Date

YEAR
2014

LOCATION VILLA POMA (MN)

INSTALLATION DESCRIPTION

Cooling system named MICRO_CLIMA, of areas occupied by workers between belt lines at the end of quenching in the COLD-END division

TECHNICAL DETAILS
  • Positioning of 12 thermoventilation units (U.T.V.) 7000 vertical type in the department
  • Construction of an aerolic network with micro-perforated tissue channels and diffusers of displacement in INOX steel
  • Construction of a water distribution network from the central refrigeration plant to the U.T.V., made with galvanised steel pipes with stapled joints, complete of interception and balancing bodies
  • Construction of thermal insulation
  • Construction of a management system plant and hygrothermal values control of the air, through PLC digital electronic programmer

OTHER ACHIEVEMENTS

We respect your Privacy.
We use cookies to ensure you an accurate experience and in line with your preferences.
With your consent, we use technical and third-party cookies that allow us to process some data, such as which pages are visited on our website.
To find out more about how we use this data, read the full disclosure.
By clicking the ‘Accept’ button, you consent to the use of cookies, or configure the different types.

Configure cookies Reject
Accept
Loading...